Data Center Cooling Standards Are Evolving. Is Your Leak Testing Keeping Up?
The data center industry is evolving rapidly. As demand for artificial intelligence (AI) and high-performance computing continues to grow, manufacturers are developing increasingly advanced cooling systems to support higher rack densities and more demanding operating environments.
For manufacturers of coolant distribution units (CDUs), chillers, manifolds, hoses, cold plates, and other cooling components, keeping up with changing requirements can be challenging.
Government regulations, industry standards, technical guidance, and customer specifications all influence how cooling equipment is designed, manufactured, and tested. However, these requirements are not always consistent across the supply chain, and what one customer considers acceptable may not meet another customer’s expectations.
Organizations such as ASHRAE and the Open Compute Project (OCP) are helping shape technical guidance and performance expectations. Meanwhile, data center operators and equipment manufacturers are developing their own specifications to address the reliability needs of increasingly complex liquid-cooling systems.
These expectations often extend to component suppliers, creating new testing challenges for products that may previously have been evaluated using different acceptance criteria. The first step toward staying ahead is understanding how applicable requirements translate into practical manufacturing tests.
EXPLORE CTS’ TEST SOLUTIONS FOR DATA CENTER COOLING SYSTEMS →
Current Data Center Cooling Regulations and Industry Standard
Several regulations, industry standards, and technical guidelines influence the design, safety, efficiency, and performance of data center cooling equipment. Each addresses different aspects of the system. They do not necessarily prescribe specific production leak test methods or acceptance limits for every cooling component.
Refrigerants: EPA AIM Act Technology Transitions and UL/CSA 60335-2-40
Under the U.S. Environmental Protection Agency’s AIM Act Technology Transitions program, restrictions on refrigerants with a global warming potential (GWP) of 700 or greater apply to certain new data center, computer-room air-conditioning, and information technology equipment cooling products and systems beginning January 1, 2027, subject to applicable classifications, compliance provisions, and exceptions. [1]
These requirements are influencing the transition toward lower-GWP refrigerants. Some applications are moving toward A2L refrigerants, which are classified as mildly flammable. Where applicable, manufacturers must also consider equipment safety requirements, including UL/CSA 60335-2-40. [2]
These changes affect more than refrigerant selection. Manufacturers must evaluate how refrigerant circuits are designed, sealed, qualified, and tested. Refrigerant circuits should also be distinguished from water- and glycol-based liquid-cooling circuits, which may be subject to different requirements.
Energy Efficiency: ASHRAE Standard 90.4
ANSI/ASHRAE Standard 90.4-2025 establishes energy-efficiency requirements for data centers. As rack densities increase, cooling-system performance becomes increasingly important. [3]
Although ASHRAE 90.4 primarily addresses data center energy efficiency rather than production leak testing, manufacturers must ensure their equipment can deliver the performance required for its intended application. Depending on the equipment, functional verification may include cooling capacity, flow rates, pressure drop, pump performance, and electrical power consumption.
Equipment Performance: ASHRAE Standard 127
ASHRAE Standard 127 establishes methods for testing and rating applicable air-conditioning equipment serving data centers and other information technology equipment spaces. The standard continues to evolve, including publication of Addendum b to ASHRAE 127-2020 in February 2026. [4]
As liquid cooling becomes more prevalent, consistent methods for evaluating equipment performance are increasingly important. Manufacturers of liquid-to-liquid CDUs should evaluate applicable ASHRAE provisions, OCP testing methodologies, and customer specifications when establishing performance-verification procedures. Depending on the application, cooling capacity, coolant flow, pressure drop, temperature control, and power consumption are important measurements.
Industry Guidance: Open Compute Project Liquid-Cooling Specifications
The Open Compute Project is playing an important role in developing technical guidance and common approaches for data center liquid-cooling infrastructure. OCP initiatives address CDUs, cold plates, manifolds, hoses, quick disconnects, and liquid-cooling interfaces. [5]
One relevant publication is the “OCP Liquid-to-Liquid CDU Test Methodology and Performance Rating” white paper, which provides guidance for evaluating CDU performance and supporting consistent equipment qualification. [6]
Applicable OCP guidance and customer specifications may influence:
- Leak integrity and pressure containment
- Cooling capacity and flow performance
- Pressure-drop characteristics
- Fluid compatibility and internal cleanliness
- Equipment qualification and reliability
- Performance documentation and traceability
OCP publications are not automatically government regulations. However, when incorporated into customer purchasing or qualification specifications, they can become important requirements for equipment manufacturers and component suppliers. Understanding these expectations early can help avoid costly production-process changes.
Equipment and Facility Safety: IEC 62368-1, NFPA 75, NFPA 855, and NEC Article 645
Data center safety requirements extend beyond cooling equipment. IEC 62368-1 addresses safety of applicable information and communication technology equipment. NFPA 75 addresses fire protection for information technology equipment environments, while NFPA 855 covers stationary energy storage installations. The National Electrical Code, including Article 645 where applicable, also influences certain IT equipment installations. [7–10]
These requirements address different aspects of equipment and facility safety. They should not be interpreted as universal production leak-testing requirements for CDUs, manifolds, hoses, or cold plates. Manufacturers must determine which requirements apply to their equipment, intended application, and installation environment.
The Challenge with Today’s Cooling Requirements
Regulations and industry standards establish important requirements, but they do not necessarily tell manufacturers exactly how to test every component on the production line. That is where customer specifications become especially important.
Depending on the application, customer requirements may include:
- Quantified leak-rate limits: Measurable acceptance criteria rather than simply checking for visible leakage.
- Measured flow and pressure drop: Verification that a component performs within specified operating limits.
- Pressure integrity testing: Confirmation that components withstand specified proof pressures or other defined conditions.
- Verified dryness: Confirmation that a fluid circuit meets defined moisture requirements, where applicable.
- Fluid-circuit cleanliness: Verification that internal contamination meets customer requirements.
- Serialized test records: Traceable results associated with individual components or assemblies.
These requirements can create a disconnect between component suppliers and equipment manufacturers. A supplier may test a hose, fitting, or quick disconnect to one specification, only to discover that the equipment manufacturer requires a different test method, tighter acceptance limit, or more detailed documentation.
Manufacturers may need to revisit existing processes, validate new requirements, and determine whether current equipment can achieve the required accuracy, repeatability, and throughput. Every manifold, hose, quick disconnect, and cold plate introduces connections and potential leak paths. A leak near high-value computing equipment can result in equipment damage, operational disruption, and downtime.
LEARN MORE ABOUT CTS’ TEST SOLUTIONS FOR DATA CENTER COOLING SYSTEMS →
The Challenge of Defining What “Leak Tight” Means
There is no single leak-rate limit or test method suitable for every cooling component. The appropriate approach depends on component design, materials, operating fluid, pressure, temperature, and consequences of leakage.
A water-immersion bubble test may identify visible leakage but may not provide the quantitative sensitivity or repeatability required for another application. Pressure-decay and differential-pressure testing can provide quantitative leak measurements when properly designed, calibrated, and validated.
For applications requiring greater sensitivity, tracer-gas methods such as helium or forming-gas testing may be appropriate. However, the most sensitive test method is not automatically the best solution. Manufacturers must balance sensitivity, part characteristics, test conditions, cycle time, and production requirements.
Refrigerant and water/glycol circuits can have different operating pressures, fluid properties, temperature ranges, and acceptance criteria. A test method suitable for one circuit may not be appropriate for another.
How to determine ideal leak test requirements for cooling assemblies
Before selecting a method, consider:
- What fluid will the component contain, and what are the consequences of leakage?
- What pressures and temperatures will it experience?
- What leak-rate acceptance limit is appropriate?
- Is pressure-based testing sufficiently sensitive, or is tracer-gas testing required?
- Can the component safely withstand vacuum testing or must it be tested under positive pressure?
- What accuracy, repeatability, cycle time, and traceability are required?
The goal is not simply to choose the most sensitive test available. It is to establish a validated testing process that reliably verifies product requirements under appropriate conditions. A well-designed process helps manufacturers verify integrity, manage risk, and provide customer confidence.
For a more detailed look at how application factors influence acceptable leak rates, read: How to Determine Leak Rates in Data Center Cooling Systems →
Beyond Leak Testing: Verifying Cooling-System Performance
A component can pass a leak test and still fail functional requirements. Likewise, passing a hydrostatic pressure test does not necessarily demonstrate compliance with a specified quantitative leak-rate limit.
Complementary testing processes may include:
- Leak integrity testing: Verifies leakage against an established acceptance limit.
- Hydrostatic pressure testing: Evaluates pressure containment under specified conditions.
- Pressure cycling and pulsation testing: May evaluate durability during qualification or reliability testing.
- Functional testing: Verifies coolant flow, pressure drop, and other defined operating parameters.
- Cleanliness verification: Evaluates internal contamination against established requirements.
- Dryness verification: Evaluates moisture-related conditions where applicable. Outlet purge-gas dew point may be a useful process indicator, but its relationship to residual moisture must be validated.
These processes are not interchangeable. Manufacturers should distinguish design qualification, reliability testing, and routine production acceptance testing. Not every test is required on every unit; the strategy depends on product requirements, risk, and customer expectations.
Questions on Your Testing Process? Contact the Experts at CTS!
How Do You Stay Ahead? Work with Experienced Leak and Functional Testing Experts
Manufacturers can stay ahead by reviewing applicable regulations, standards, and customer specifications early in product development. Clear acceptance criteria, alignment across the supply chain, and validated production test methods help reduce uncertainty and avoid costly changes.
Cincinnati Test Systems has more than 40 years of experience developing leak and functional testing technologies for demanding manufacturing applications. Whether you are developing a new cooling component, responding to more stringent specifications, or reassessing an existing process, CTS can help evaluate requirements and identify appropriate testing solutions.
The right testing strategy is not simply about detecting leaks. It is about verifying product integrity, ensuring consistent performance, managing risk, and delivering the confidence customers expect.
Source Information and Technical References
[1] U.S. EPA — Technology Transitions: HFC Restrictions by Sector
[2] UL Solutions — UL 60335-2-40 safety standard update
[3] ASHRAE — Standards and Guidelines: titles, purposes, and scopes (Standard 90.4)
[4] ASHRAE — Published standards addenda (Standard 127-2020 Addendum b)
[5] Open Compute Project — Cold Plate and liquid cooling initiatives
[6] Open Compute Project — Liquid-to-Liquid CDU Test Methodology and Performance Rating, R1 (PDF)
[7] IEC — IEC 62368-1, Audio/video, information and communication technology equipment — Safety requirements
[8] NFPA — NFPA 75, Standard for the Fire Protection of Information Technology Equipment
[9] NFPA — NFPA 855, Standard for the Installation of Stationary Energy Storage Systems